Topteam continuous investment in our mold making facilities has kept our company at the forefront of quality injection mold making. Our equipment includes High Speed CNC, Slow Wire Cut Machines, Precise EDM, Gun Drilling Machine, Fitting Machine and a full complement of turning, grinding and other miscellaneous equipment.
Our focus is high quality parts that meet and exceed our customers' expectations. We provide tool design and mold making solutions designed to reduce cost by enhancing productivity. Backed by our experienced mold making and management personnel, our in-house mold making makes it possible to ensure the highest quality standards while reducing lead time and guaranteeing delivery schedules.
We build:
★ Insert Molds
★ BMC Molds
★ Two Shot Molds
★ Unscrewing Molds
★ Overmolding Molds
★ Hot Runner Molds
★ Metal Injection Molds / MIM
★ High Pressure Die Casting Tooling
★ Multiple Slides Action
★ High Precision Plastic Molds
★ Single Cavity or Multi Cavity Molds
★ Stripper or Floating Cavity Plate Molds
★ High Volume Production or Prototype Molds
Standard:
★ All molds are constructed according to customers' requirement;
★ DME, HASCO, LKM, RABOURDIN, FUTABA;
★ Conformance SPI/SPE classes (101,102… ) or above;
★ Conformance European standard are available;
★ Production mold standards, prototype tools standard for testing purpose are available;
★ We build hot runner molds and are familiar with many different systems such as DME,Moldmaster, Mastip,
Hasco,Yudo, Incoe, Husky etc..The manifold recommended for your tool is selected to meet you individual need;
Mould Steel and plastics material commonly used by us:
Steel material: 420/1.2083/H13/1.2344/1.2767/S136/S7/P20/1.2311/4130/NAK80/SKD61/840
Plastic material: ABS, PC, POM, PVC, PP, PS, TPE, TPU, PMMA, Nylon, Nylon with glass
fiber, PTFE etc.
Special plastic material: PSU, PEEK, PPS, PES, Ultem(with Glass Filler), ABS or Nylon(with
Carbon Filler) etc.;
Other requirements:
Use Copper alloy and/or Beryllium copper to optimize the cooling performance at the critical
Area. Electrochemical nickel plating on mold base upon request;
Lead-time:
Base on mold complexity and production status, 2-4 weeks for prototype molds and 4-8 weeks
for production molds; Base on mold modification complexity status, 2-7 work days;

